Phone / WeChat: +86 139 8161 9833 · E-mail: [email protected]Factory-direct supply · Worldwide shipping · Samples available
Home›Applications›Drives & renewables

Capacitors for drives & renewables

Wind and solar converters, variable frequency drives and traction converters all share one architecture problem: a DC bus that has to absorb ripple current and hold voltage under load steps. We supply the DC-link and the snubber side of that problem.

DC-linkIEC 61071450 – 2,300 V DCWind · PV · VFD · Traction

Designing the DC bus

Why film replaced electrolytic in new designs

Three reasons decide it. Ripple current: a polypropylene DC-link carries far more per unit volume than an electrolytic of the same size. Lifetime: an electrolytic halves its life for every 10 °C rise and ends abruptly, whereas the film part self-heals and degrades gradually. Maintenance: a converter whose DC bus is not a wear item does not need a scheduled replacement interval.

What to send

For a DC-link proposal we need the DC voltage, the switching frequency, the ripple current to be absorbed, the allowed voltage ripple and the available envelope. For a snubber proposal, the module type and the loop geometry are the starting point.

Frequently asked questions

Can I replace an electrolytic DC-link with a film capacitor?
Usually yes, and with better ripple-current capability and life — but capacitance per unit volume is lower, so the capacitance value and the mechanical envelope have to be re-derived. Send the original part number and the available space.
Which standard do the DC-link capacitors follow?
The C480 / C481 family is designed to IEC 61071.
Do you supply capacitors for traction converters?
Yes — traction converters are among the applications of the DC-link and snubber families.

See also

Supply, payment and documentation terms

Commercial and technical terms per order: price, lead time, minimum quantity, samples, payment procedure and the shipping document pack.

PricePrice on request: we issue a quotation within 2 working days of receiving your part list (type, capacitance, voltage, quantity).
Lead timeStandard items are produced in 4–8 weeks from order confirmation; custom designs are scheduled individually.
Minimum orderSmall batches and custom designs are supported; minimum quantity is confirmed per specific part number.
SamplesSamples for qualification testing are available on request, before a series order is placed.
PaymentSettlement currency, payment method and delivery basis (Incoterms 2020) are confirmed in the quotation for each specific request.
Shipping & deliveryShipped directly from the factory: by road or rail via western crossings (including transit through Kazakhstan), air freight for urgent items. Import VAT and customs duties are paid by the importer.
Certificates & documentsCertificate of origin, invoice and packing list, transport documents (CMR / rail waybill), technical specification and inspection certificate — English or Russian as required.
Regulatory documentsInformation support for TR CU 004/2011 and TR CU 020/2011 declarations and EAC marking: we provide product characteristics and data for filing.
WarrantyWarranty term and conditions are fixed in the supply contract; batch acceptance test reports are available on request.

Request price and lead time

Send us your part list (type, capacitance, voltage, tolerance, temperature range) and quantity — we will reply with a quotation within 2 working days.

Phone / WeChat+86 139 8161 9833