Phone / WeChat: +86 139 8161 9833 · E-mail: [email protected]Factory-direct supply · Worldwide shipping · Samples available
Home›Alternatives›CDE alternatives

CDE alternatives

Replacement for CDE — Cornell Dubilier — capacitor families: the 941C / 942C / 943C ultra-high dV/dt polypropylene types, the 930 / 932 / 935 / 950 / 936C series, and the DPP / DPPM / DPM ranges.

941C / 942C / 943CDPP · DPPM · DPMHigh dV/dtPulse power

Series mapping

The parameter that decides the match

In high dV/dt duty the limiting factor is not the capacitance value but the repetitive pulse capability: peak current per microsecond, ripple current and internal temperature rise. Send the CDE part number together with the pulse or ripple duty it sees — we match on that basis rather than on capacitance alone.

Also relevant

If the original part is a high-temperature mica type rather than a film capacitor, the CV series is the corresponding route — see mica capacitors and the Eurofarad HT replacement page.

CDE familyTypeOur replacement route
941C / 942C / 943CUltra-high dV/dt polypropyleneC451 – C458: 100 – 3,000 V, 0.001 – 33 µF
930 / 932 / 935 / 950 / 936CPulse and energy-storage filmC451 – C458 and high-voltage families
DPP / DPPM / DPMDC and pulse polypropyleneFilm range; DC-link (C480/C481) for high current
MLP (mica)High-temperature micaCV series: −55…+155 °C, up to +250 °C special

Frequently asked questions

Can your capacitors replace CDE 941C exactly?
The C451 – C458 family covers the same ultra-high dV/dt duty and the equivalent voltage and capacitance ranges. Send the part number and the pulse duty for a confirmed match.
Do you have equivalents for CDE military-grade mica types?
Where the original is a high-temperature mica part, the CV series is the corresponding route. Note that MIL-qualified (QPL) part numbers carry certification requirements that we do not claim to meet; for those programs we can supply as a documented second source only.
What documentation comes with a replacement?
The technical specification for the part number, the dimensional drawing, and batch acceptance test data on request.

See also

Supply, payment and documentation terms

Commercial and technical terms per order: price, lead time, minimum quantity, samples, payment procedure and the shipping document pack.

PricePrice on request: we issue a quotation within 2 working days of receiving your part list (type, capacitance, voltage, quantity).
Lead timeStandard items are produced in 4–8 weeks from order confirmation; custom designs are scheduled individually.
Minimum orderSmall batches and custom designs are supported; minimum quantity is confirmed per specific part number.
SamplesSamples for qualification testing are available on request, before a series order is placed.
PaymentSettlement currency, payment method and delivery basis (Incoterms 2020) are confirmed in the quotation for each specific request.
Shipping & deliveryShipped directly from the factory: by road or rail via western crossings (including transit through Kazakhstan), air freight for urgent items. Import VAT and customs duties are paid by the importer.
Certificates & documentsCertificate of origin, invoice and packing list, transport documents (CMR / rail waybill), technical specification and inspection certificate — English or Russian as required.
Regulatory documentsInformation support for TR CU 004/2011 and TR CU 020/2011 declarations and EAC marking: we provide product characteristics and data for filing.
WarrantyWarranty term and conditions are fixed in the supply contract; batch acceptance test reports are available on request.

Request price and lead time

Send us your part list (type, capacitance, voltage, tolerance, temperature range) and quantity — we will reply with a quotation within 2 working days.

Phone / WeChat+86 139 8161 9833